A Study of workflow with synchronization of design process on autodesk construction cloud

A Study of workflow with synchronization of design process on autodesk construction cloud

Nattasit Chaisaard, Thanom Seehatrai, Grit Ngowtanasuwan, Jinthisa Suraprasert

Abstract. This research aims to accomplish two primary goals: (1) To compare workflows in the design department between conventional design working procedures and collaborative processes driven by ACC-supported approaches. Understanding the key distinctions and similarities between these two approaches is crucial. (2) To suggest replacing the current workflow with one that utilizes synchronization of the design process on the ACC platform. Five key semi-structured interview questions were developed using qualitative research methods. These questions guided the analysis of content from in-depth interviews with twelve professionals. They included four architects, four engineers, two draftsmen/BIM modelers, and two quantity surveyors (QSs). QDA Miner Lite was selected as the research software to facilitate data analysis. This research identified key differences between conventional design processes and those using Autodesk Construction Cloud (ACC), particularly in data workflow. Cloud-BIM, like ACC-supported approaches, utilizes a centralized, administrator-managed process for data transmission, minimizing inconsistencies. This streamlined approach from ACC saves time and improves collaborative design efficiency. In addition, ACC workflows also offer a significant advantage in monitoring and synchronization. They incorporate automated clash detection and 3D model review. Combining A/E Drawings is another area where ACC excels. Conventional design processes typically require complete DWGs upfront, which can easily lead to inconsistencies. In contrast, ACC utilizes an automatic 3D inspection system, enhancing clarity and ensuring initial accuracy. Additionally, ACC generates complete DWGs as the final deliverable. Finally, the research recommends using ACC-Synchronized Design to minimize human error. To achieve this, it suggests establishing two key measures: (1) A data management team to handle data reception, transmission, and centralized storage. (2) An expert-led design review committee to conduct a comprehensive assessment of the design to ensure its constructability.

Keywords
Autodesk Construction Cloud, Workflow, Design Working Procedures, Synchronization, BIM Maturity

Published online 2/25/2025, 12 pages
Copyright © 2025 by the author(s)
Published under license by Materials Research Forum LLC., Millersville PA, USA

Citation: Nattasit Chaisaard, Thanom Seehatrai, Grit Ngowtanasuwan, Jinthisa Suraprasert, A Study of workflow with synchronization of design process on autodesk construction cloud, Materials Research Proceedings, Vol. 48, pp 1109-1120, 2025

DOI: https://doi.org/10.21741/9781644903414-119

The article was published as article 119 of the book Civil and Environmental Engineering for Resilient, Smart and Sustainable Solutions

Content from this work may be used under the terms of the Creative Commons Attribution 3.0 license. Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.

References
[1] Dogac, A. (Ed.). (1998). Workflow management systems and interoperability (Vol. 164). Springer Science & Business Media.
[2] Medina-Mora, R., Winograd, T., Flores, R., & Flores, F. (1992, December). The action workflow approach to workflow management technology. In Proceedings of the 1992 ACM conference on Computer-supported cooperative work (pp. 281-288). https://doi.org/10.1145/143457.143530
[3] Baecker, R. M. (Ed.). (1993). Readings in groupware and computer-supported cooperative work: Assisting human-human collaboration. Morgan Kaufmann.
[4] Chaisaard, N., Ngowtanasuwan, G., & Doungpan, S. (2020, August). A review of construction project management guidelines under the impact of COVID-19 epidemic dispersal: a case study of Thai construction projects. In SUT international virtual conference on science and technology, Nakhon-Ratchasima, Thailand (Vol. 28).
[5] Iqbal, K. M. J., Khalid, F., & Barykin, S. Y. (2021). Hybrid workplace: The future of work. In Handbook of research on future opportunities for technology management education (pp. 28-48). IGI Global. https://doi.org/10.4018/978-1-7998-8327-2.ch003
[6] NIBS. (2007). National Building Information Modeling Standard™.
[7] https://buildinginformationmanagement.files.wordpress.com/2011/06/nbimsv1_p1.pdf
[8] Santos, E. T. (2009, November). Building information modeling and interoperability. In XIII Congress of the Iberoamerican Society of Digital Graphics-From Modern to Digital: The Challenges of a Transition Sao Paulo, Brazil.
[9] Eastman, C., Teicholz, P., Sacks, R., & Liston, K. (2008). BIM handbook introduction. BIM handbook: A guide to building information modeling for owners, managers, architects, engineers, contractors, and fabricators, 1-63. https://doi.org/10.1002/9780470261309.ch1
[10] Succar, B. (2009). Building information modelling framework: A research and delivery foundation for industry stakeholders. Automation in construction, 18(3), 357-375. https://doi.org/10.1016/j.autcon.2008.10.003
[11] Autodesk Construction Cloud https://synergysoft.co.th/products/construction-cloud-solutions
[12] Kosovac, B., Froese, T., & Vanier, D. (2000). Integrating heterogeneous data representations in model-based AEC/FM systems. Proceedings of CIT, 2, 556-567.
[13] Halfawy, M. R., & Froese, T. (2002, June). Modeling and implementation of smart AEC objects: an IFC perspective. In Proceedings of the CIB w78 Conference: Distributing Knowledge in Building, Aarhus School of Architecture, 12-14 June (2002) (pp. 1-8).
[14] Froese, T. (2003). Future directions for model-based interoperability. In Construction Research Congress: Wind of Change: Integration and Innovation (pp. 1-8). https://doi.org/10.1061/40671(2003)101
[15] Sparkes, A. C., & Smith, B. (2009). Judging the quality of qualitative inquiry: Criteriology and relativism in action. Psychology of sport and exercise, 10(5), 491-497. https://doi.org/10.1016/j.psychsport.2009.02.006
[16] Ullah, K., Lill, I., & Witt, E. (2019, May). An overview of BIM adoption in the construction industry: Benefits and barriers. In 10th Nordic conference on construction economics and organization (pp. 297-303). Emerald Publishing Limited. https://doi.org/10.1108/S2516-285320190000002052
[17] Afsari, K., Eastman, C. M., & Shelden, D. R. (2016). Cloud-based BIM data transmission: current status and challenges. In ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction (Vol. 33, p. 1). IAARC Publications. https://doi.org/10.22260/ISARC2016/0129
[18] Bengtsson, M. (2016). How to plan and perform a qualitative study using content analysis. NursingPlus open, 2, 8-14. https://doi.org/10.1016/j.npls.2016.01.001
[19] Schmailzl, M., Spitzhirn, M., Eder, F., Krüll, G., Linner, T., Obergrießer, M., … & Lafhaj, Z. (2023). Towards interfacing human centered design processes with the AEC industry by leveraging BIM-based planning methodologies. In ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction (Vol. 40, pp. 325-332). IAARC Publications. https://doi.org/10.22260/ISARC2023/0045
[20] Wu, K., & Tang, S. (2022). BIM-Assisted Workflow Enhancement for Architecture Preliminary Design. Buildings, 12(5), 601. https://doi.org/10.3390/buildings12050601
[21] Oraee, M., Hosseini, M. R., Edwards, D. J., Li, H., Papadonikolaki, E., & Cao, D. (2019). Collaboration barriers in BIM-based construction networks: A conceptual model. International Journal of Project Management, 37(6), 839-854. https://doi.org/10.1016/j.ijproman.2019.05.004
[22] Wong, J., Wang, X., Li, H., & Chan, G. (2014). A review of cloud-based BIM technology in the construction sector. Journal of information technology in construction, 19, 281-291.
[23] Beach, T. H., Rana, O. F., Rezgui, Y., & Parashar, M. (2013). Cloud computing for the architecture, engineering & construction sector: requirements, prototype & experience. Journal of Cloud Computing: Advances, Systems and Applications, 2, 1-16. https://doi.org/10.1186/2192-113X-2-8
[24] Abdelhai, N. (2022). Integration BIM and emerging technologies in architectural academic programs. IntechOpen.
[25] Tang, S., Shelden, D. R., Eastman, C. M., Pishdad-Bozorgi, P., & Gao, X. (2019). A review of building information modeling (BIM) and the internet of things (IoT) devices integration: Present status and future trends. Automation in Construction, 101, 127-139. https://doi.org/10.1016/j.autcon.2019.01.020
[26] Bagrodia, R. (1989). Process synchronization: Design and performance evaluation of distributed algorithms. IEEE Transactions on Software Engineering, 15(9), 1053-1065. https://doi.org/10.1109/32.31364
[27] Coudert, T., Vareilles, É., Aldanondo, M., Geneste, L., & Abeille, J. (2011, September). Synchronization of system design and project planning: Integrated model and rules. In 2011 5th International Conference on Software, Knowledge Information, Industrial Management and Applications (SKIMA) Proceedings (pp. 1-6). IEEE. https://doi.org/10.1109/SKIMA.2011.6089969